Photographs of the Coffee Shop Build
Church Front East Side Space for the Coffee Shop
Proposed site Waste Storage Kelston Hall Emergency Door
Existing Steps Kelston Hall windows Wall Repointing Church Foyer New toilet entrance Site for new emergency door
The Start Of The New Coffee Shop 29th August 2012
September 10th 2012
September 13th 2012
Church Foundations Drains for new toilet
New foundations New foundations
September 22nd
Floor Slab Floor Slab
September 29th
Buttress supports Buttress Supports
October 9th
Roof Construction Roof Construction
October 23rd
Roof Timbers Front View
Insulation Completed woodwork
Roof Build Nov 1st
December 4th Update
Ceiling Inserts Cleaned Stonework First Fix Electrics
Handicapped Toilet construction
Dec 17th Update
New Door Frame New door Steps Kelston Hall & Floor Insulation Keslton Hall as Workshop & New Windows
January 18th 2013
New Doorway into the Church New Emmergency Doorway Kelston Hall Replacing Foundation Stone
1884 Newspaper Time Capsule behind First Deliveries of Equipment, Crockery etc
Foundation Stone (see later for details)
February 8th 2013
The featured Church wall cleaned and repointed New Drains Handicapped Toilets in Foyer
New Electric Entrance Door Servery Units Arriving New Entrance to Church Foyer and Toilet
March 2013
Final stages Servery Being Inserted Wall Finishes
Men at Work
Meal Preparation
Wesley Suite Kelston Hall Cutting the Ribbon
THE COFFEE SHOP
Celebration Meal in Wesley Suite Celebration Meal in Kelston Hall The Coffee Shop at Night
|